Why we don't publish a week-by-week schedule
How long each phase takes depends on the scope, how quickly selections are made, product lead times, permits and inspections, and what turns up behind the walls. A generic timeline would be wrong for most kitchens. What is consistent is the order of the work, and that's what this guide shows. Your own schedule is discussed once your scope is set.
Stage 1: The kitchen before
This Herndon kitchen had cream raised-panel cabinets, granite counters, a gray subway tile backsplash, black stainless appliances, pendant lighting and a granite-topped island. Before any work, the consultation, design and selections steps happen with the kitchen still in use: layout, cabinet plan, materials and a written scope.



Stage 2: Demolition
The house is protected, the kitchen is emptied, and cabinets, counters and tile come out. This is when hidden conditions appear. Here, removing the backsplash revealed an old wallpaper border and a patched drywall section. Findings like this are normal and get addressed before anything new goes in.


Stage 3: Rough-ins
With walls open, plumbing, gas, electrical and ventilation are run or moved to match the new layout. Where permits are required, rough-in inspections typically happen before walls are closed. In this kitchen, that work supported a gas cooktop, stacked wall ovens, island lighting and new outlets.
Stage 4: Cabinets and backsplash
Cabinets are set, leveled and fastened. In this kitchen, white shaker cabinets went in and a square tile backsplash followed, with the countertops still protected. The gas cooktop was installed with tile behind it.


Stage 5: Island, countertops and appliances
The island boxes were built from raw wood before finishing. Quartz went on over the base cabinets, including a corner lazy-susan. A black french-door refrigerator and stacked wall ovens took their places. Countertops are templated only after base cabinets are set, and the sink and faucet need to be chosen by then.



Stage 6: Lighting and built-ins
Two pendant fixtures were hung over the island area once its position was final. Nearby, a built-in storage bench with cubbies and drawers and tall cabinetry went in, shown here before final paint.



Stage 7: Finish work and closeout
Paint, trim, hardware, fixtures and final connections come next, followed by any final inspections and a walkthrough together to address closeout items. This project was still in progress when photographed; we'll add the finished photos when it's complete. For a finished Herndon kitchen, see the completed project on our projects page.

What you'll be doing at each stage
- Before: make selections on time so products arrive when needed
- Demolition: clear the kitchen and set up a temporary cooking spot
- Rough-ins: be available for questions when the walls are open
- Cabinets and counters: confirm sink, faucet and appliance details
- Closeout: walk the kitchen and list anything that needs attention
How long does a kitchen remodel take?▸
It depends on scope, selections, permits and what's found during demolition. We don't publish a standard timeline; your schedule is discussed once the scope is set.
When is the kitchen unusable?▸
In a full remodel, roughly from demolition until the counters, sink and appliances are back in service.
What happens if demolition uncovers a problem?▸
We show you, explain the options, and agree on how to handle it before moving on. The written scope should say how unknown conditions are handled.